6) Design towards Intermediate Review
Re-order proposal conceptual into design conceptual based on workflow
Extract all Racked Equipment from the equipment list and initially place
in racks/consoles based on Conceptual, workflow and equipment list headings
Generate Patching Elevations
Determine power and heat loading
Determine any path choke points and single points of failure
Confirm router sizes and patch panel throughput
Confirm server and other storage suitability as quoted
Determine DA usage
Determine system timing based on conceptual/workflow requirements
Determine all equipment that requires reference and generate initial reference drawings
Generate initial Network Drawings
Generate Test Plan
Generate Implementation and cut over plan
Finalize equipment placement in racks and consoles
Finalize power and heat loading
Intermediate Design review
Implement changes from design review
Start Equipment Procurement